NIP Paysage Logo

DEMOLITION AND RECYCLING OF THE FORMER CHAMPLAIN BRIDGE, Montreal, Qc. Canada


HOME  /    PROJECTS  /    territories + large landscapes  / DEMOLITION AND RECYCLING OF THE FORMER CHAMPLAIN BRIDGE

DESCRIPTION

Feasibility study in preparation of the demolition plan of the obsolete bridge, optimizing the redevelopment of the structure and the terrain it currently occupies. Following the Metropolitan Transport Plan’s approach to major urban projects, numerous proposals are presented in connection while enhancing development assets. The study shows different scenarios, celebrating the bridge before its demolition, the recycling of its materials, as well as the creation of a recreational centre on the dike connecting Brossard and Île-des-Soeurs, offering exceptional views to the new bridge were part of the reflections.

(1) Site plan, NIPPAYSAGE

(2) Wooden pier section cut, NIPPAYSAGE

(3) Bird rest area section cut, NIPPAYSAGE

(4) Shoreline restoration section cut, NIPPAYSAGE

(5) Belvedere cross-section, NIPPAYSAGE

(6) Slope restoration section cut, NIPPAYSAGE

(7) River lookout section cut, NIPPAYSAGE

(8) Artwork section cut, NIPPAYSAGE

(9) Historical route section cut, NIPPAYSAGE

(10) Surf wave section cut, NIPPAYSAGE

(11) Beach section cut, NIPPAYSAGE

(12) Pier section cut, NIPPAYSAGE

(13) Sports tower, NIPPAYSAGE

(14) Interpretive trail, NIPPAYSAGE

(15) Plan of potentiels, NIPPAYSAGE

(16) Biotic environments, NIPPAYSAGE

Banner's images; NIPPAYSAGE

client

Société des ponts Jacques-Cartier et Champlain inc.

TEAm

Michel Langevin, Josée Labelle, Mathieu Casavant, Mélanie Mignault, Catherine Blain

year

2016-2017

COLLABORATION


Provencher_Roy

Parsons

Tetra Tech

Amec Foster Wheeler

DEMOLITION AND RECYCLING OF THE FORMER CHAMPLAIN BRIDGE

Share by: