HOME / PROJECTS / territories + large landscapes / DEMOLITION AND RECYCLING OF THE FORMER CHAMPLAIN BRIDGE
Feasibility study in preparation of the demolition plan of the obsolete bridge, optimizing the redevelopment of the structure and the terrain it currently occupies. Following the Metropolitan Transport Plan’s approach to major urban projects, numerous proposals are presented in connection while enhancing development assets. The study shows different scenarios, celebrating the bridge before its demolition, the recycling of its materials, as well as the creation of a recreational centre on the dike connecting Brossard and Île-des-Soeurs, offering exceptional views to the new bridge were part of the reflections.
(1) Site plan, NIPPAYSAGE
(2) Wooden pier section cut, NIPPAYSAGE
(3) Bird rest area section cut, NIPPAYSAGE
(4) Shoreline restoration section cut, NIPPAYSAGE
(5) Belvedere cross-section, NIPPAYSAGE
(6) Slope restoration section cut, NIPPAYSAGE
(7) River lookout section cut, NIPPAYSAGE
(8) Artwork section cut, NIPPAYSAGE
(9) Historical route section cut, NIPPAYSAGE
(10) Surf wave section cut, NIPPAYSAGE
(11) Beach section cut, NIPPAYSAGE
(12) Pier section cut, NIPPAYSAGE
(13) Sports tower, NIPPAYSAGE
(14) Interpretive trail, NIPPAYSAGE
(15) Plan of potentiels, NIPPAYSAGE
(16) Biotic environments, NIPPAYSAGE
Banner's images; NIPPAYSAGE
Société des ponts Jacques-Cartier et Champlain inc.
Michel Langevin, Josée Labelle, Mathieu Casavant, Mélanie Mignault, Catherine Blain
2016-2017
COLLABORATION
Provencher_Roy
Parsons
Tetra Tech
Amec Foster Wheeler
NIPPAYSAGE
All rights reserved | Powered by dakis